- 8" Stack (check local codes)
- 4-1/2" all thread hangers. Heater must be mounted
level.
- 115 VAC 20 amp power source. Wire and conduit per local
codes.
- Low voltage thermostat wire to "T" terminals
of oil primary control on burner.
- Oil suction line, 3/8" copper tubing.
- Oil feed line, 3/8" to bulkhead connector on heater
cabinet.
- Suction line 6" minimum from bottom of supply tank
to prevent sludge from being introduced into the supply
line.
|